ACOS Highlights


Page(s): 1 2 3 4 5 »   Rows:36   Results per page:
    Quick filter:
VERSIONDATUMBILDTITEL
8.6Lists with multiple rows
Data handling is really excellent. Even multi row reports, formulas on dates and costs are editable and give you comfortable features like editing and replacing many records on one step. Single line formats can be exchanged in both directions via clipboard with drag and drop (for example from and to Excel).
8.6Calendars for relationships, resources and activities
Acos is calculating jobs with different calendars (up to 256), resource calendars (999) and distribution functions (999). Even for relationships calendars are available (for example for drying periods).
8.6Data format independant from the language
You can change the programs surface from german to english or portuguese any time without any changes on the data. The text field are large enough to have multiple languages in one job. For the output you can choose the text field of your favour.
8.6Local Single project, central Multi Project
Pool planning allows many project managers working on their own locked data at the same time. Nevertheless all are using common pool data like resources, calendars and distribution functions.
8.6Company data model
ACOS PM Software can be included into your company's data model. 13 SQL databases are realized up to now.
8.6User/Roles/Rights
Secure data access by stored procedures gives the user selective access on all his project data in ACOS WEB and ACOS Client as well. The classical User/Role/Right-System is available for each org with security levels from 0 to 8. The system administrator has special rights on level 9 and can define new orgs.
8.6Central SQL database (normalized)
The ACOS Multiproject Server is a safe basis for all project management data of your organisations. Secure update scripts enable the continuous work on the same data basis. Interfaces to other systems - mostly defined by ACOS WEB are transferring data even between different SQL-databases. Extensions of the structure are possible without any problems.
8.6Fullfills international planning standards
The network diagram shows the responsible predecessors and successors with a red double arrow. By this the structural sequence of work can be followed up easily. Standard workflows with all resource allocations can be imported as modules for new projects with predefined links.